IPT Well Solutions lands municipal Class I disposal well project in Colorado

Sep. 23, 2026
By AI, Created 05:19 UTC, Sep 23, 2026, AGP -

IPT Well Solutions has been chosen to support a municipal Class I disposal well project in central Colorado, where the work will test deep-well injection as a long-term option for brine from municipal water treatment. The assignment adds to IPT’s push in Class I injection and could shape whether the project moves into design, permitting and construction.

Why it matters: - The project could give municipal water operators a long-term disposal option for brine generated by treatment operations. - A successful feasibility study could move the effort toward design, permitting, drilling and construction. - The work adds to the pool of Class I disposal options for managing difficult wastewater streams in Colorado.

What happened: - IPT Well Solutions was selected to provide subsurface engineering and technical support for a municipal Class I disposal well project in central Colorado. - The project will evaluate deep-well injection as a long-term brine management solution. - The announcement was made Sept. 22, 2026.

The details: - IPT’s scope includes geological evaluation and static modeling. - The company will also handle reservoir simulation and sensitivity analysis. - IPT will identify and evaluate underground sources of drinking water, or USDWs. - The work includes assessment of confining units and potential injection zones. - IPT will develop a preliminary drilling and completion cost estimate. - The initial work will establish the technical foundation for future project development. - If the project advances, the next phases could include detailed design, permitting, drilling and construction. - IPT has supported more than 300 Class I, II, III, V and VI injection well projects across the United States. - IPT’s experience spans geology, reservoir engineering, permitting, drilling and completions, and well operations.

Between the lines: - Municipal brine disposal projects are a fit for IPT’s core technical mix, especially when regulators and operators need a defensible path on subsurface risk. - The focus on USDWs and confining units signals that groundwater protection will be central to the feasibility decision. - David Mannon, CEO of IPT Well Solutions, said the project adds to the company’s growing municipal Class I disposal well portfolio and brings together reservoir, geology, drilling and regulatory expertise.

What's next: - IPT will complete the technical work needed to determine whether the project is viable. - The study results will help decide whether the project moves into permitting and engineering for a full buildout. - If advanced, the project would proceed to detailed design, drilling and construction planning.

The bottom line: - IPT is positioning itself as a specialist for municipal deep-well disposal projects, with this Colorado assignment serving as an early test of whether the concept can move from evaluation to execution.

Disclaimer: This article was produced by AGP Wire with the assistance of artificial intelligence based on original source content and has been refined to improve clarity, structure, and readability. This content is provided on an “as is” basis. While care has been taken in its preparation, it may contain inaccuracies or omissions, and readers should consult the original source and independently verify key information where appropriate. This content is for informational purposes only and does not constitute legal, financial, investment, or other professional advice.

Sign up for:

Centennial State Today

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Centennial State Today

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.